Epoxy Flooring Vancouver
High-performance flooring systems engineered for demanding facilities, installed with serious attention to preparation, safety and return-to-service.
The Right System Starts With the Slab
Miyagi Construction installs seamless epoxy, quartz and urethane-cement flooring for commercial and industrial environments. We assess moisture, traffic, chemicals, cleaning requirements and shutdown time before recommending a system.
Built for Your Environment
From clean commercial floors to hard-working production areas, the coating build-up is selected around how the space actually operates.
Epoxy Coatings
Solid-colour, decorative flake and high-build systems for warehouses, retail spaces, mechanical rooms and commercial facilities.
Quartz Systems
Decorative, slip-resistant and wear-resistant floors for wet areas, kitchens, change rooms and high-traffic spaces.
Urethane Cement
Robust flooring for thermal shock, moisture, chemicals and demanding food-processing or industrial environments.
Our Process
Assess
Review slab condition, use, exposure and schedule.
Prepare
Mechanically profile and remove weak or contaminated material.
Repair
Treat cracks, joints, spalls and concrete defects.
Install
Apply the specified system and complete final inspection.
Preparation to Completion
A professional finish depends on methodical surface preparation and careful detailing—not simply rolling on a coating.



Where These Floors Perform
Tell Us About Your Floor
Send the project location, approximate square footage and a few photos. We will review your requirements and recommend the next step, including a site visit when needed.
For a Faster Estimate, Include:
- Project location
- Approximate floor area
- Current floor photos
- Facility use and exposure
- Preferred completion date
Before You Request a Quote
How much does commercial epoxy flooring cost?
Pricing depends on slab condition, preparation, selected system, floor area, access and scheduling. Photos and approximate square footage help us provide the right starting point.
How long before the floor can return to service?
Cure time varies by coating system, temperature and traffic requirements. We plan the installation around your operating schedule and confirm reopening times before work begins.
Can you install over an existing coating?
Sometimes, but the existing coating and bond must be evaluated first. Weak, contaminated or incompatible coatings may require mechanical removal.
Do you repair cracks and damaged concrete?
Yes. Crack, joint and spall repairs can be incorporated into the preparation scope before the flooring system is installed.
What areas do you serve?
We serve Vancouver and communities across the Lower Mainland for commercial and industrial flooring projects.
Ready to Plan Your New Floor?
Speak directly with Miyagi Construction about your site, schedule and flooring requirements.